Topics
Housing and constructionPrices and consumption

Cost index of civil engineering works

Official Statistics of Finland (OSF)
The cost index of civil engineering works describes changes in costs incurred by civil engineering entrepreneurs from purchase and use of inputs. Point figures are produced from the cost index of civil engineering works by sub-index and by input group. The data are collected from various sources and published monthly.

Producer:

Statistics Finland

Releases

release | Cost index of civil engineering works 2023, April
release | Cost index of civil engineering works 2023, March
release | Cost index of civil engineering works 2023, February
release | Cost index of civil engineering works 2023, January
release | Cost index of civil engineering works 2022, December
database release | Cost index of civil engineering works 2022

Future releases

Figures

See key statistical data in the figures.
23.05.2023

Cost index of civil engineering works 2015=100

You can download the data of an automatically updated figure as an Excel table from the menu or listen to the table with the screen reader software after this figure.
Skip the table
2015M012015M022015M032015M042015M052015M062015M072015M082015M092015M102015M112015M122016M012016M022016M032016M042016M052016M062016M072016M082016M092016M102016M112016M122017M012017M022017M032017M042017M052017M062017M072017M082017M092017M102017M112017M122018M012018M022018M032018M042018M052018M062018M072018M082018M092018M102018M112018M122019M012019M022019M032019M042019M052019M062019M072019M082019M092019M102019M112019M122020M012020M022020M032020M042020M052020M062020M072020M082020M092020M102020M112020M122021M012021M022021M032021M042021M052021M062021M072021M082021M092021M102021M112021M122022M012022M022022M032022M042022M052022M062022M072022M082022M092022M102022M112022M122023M012023M022023M032023M04
11-17 Total index100.0699.50101.20100.96101.54101.46100.67100.1098.8198.5998.5898.4796.9796.2796.8396.4396.9197.7998.1498.0798.2199.0099.44100.18101.72101.99101.50100.45100.4099.8299.62100.05100.37101.04101.22102.53102.88103.00102.57102.19102.55103.73104.00104.37104.95105.28105.96104.83104.70105.11106.44106.41106.74106.08105.58106.07104.42105.04103.43103.38106.35105.78104.33100.5999.53100.43101.14101.15101.79101.83101.85103.06104.80107.62108.76108.00108.05108.62109.51110.70110.84112.31113.60113.77115.87117.58121.09124.73125.31128.24129.36127.54128.10128.37127.94127.20129.15129.35129.80129.34
12 Earth structures99.73100.58101.07101.19100.99100.7299.8699.2699.3399.3699.2698.5898.0597.8498.3698.2098.3598.5698.3298.3298.3499.0098.6999.44100.19100.0799.2999.2899.0998.6198.4198.8799.5299.8899.5499.65100.1599.9899.95100.32100.60100.52100.61100.81101.73101.91101.52100.81102.94103.27103.61103.70104.03103.47103.94103.96103.86103.68103.71103.73103.82103.28102.21101.27100.31100.91100.77100.62101.62102.04102.20102.65103.73104.71105.04104.81105.01105.52105.67106.27106.34107.32107.60107.38110.86110.95114.15116.35117.02118.95120.00120.21120.56123.30123.13121.71124.67124.86124.99124.87
14 Surfacing103.8297.11105.76103.16105.83107.53105.11101.1492.9791.9791.7093.8587.7584.6286.1984.5586.2690.6093.1293.4193.2595.3598.92101.62108.76110.59109.84102.73103.62101.12100.09100.86101.55103.79104.49111.87111.45112.57110.25106.83109.46116.49117.53118.93118.59119.91124.71120.52113.47114.57120.36119.26120.98118.56114.20116.75107.19111.53101.91101.81119.22118.47113.3294.1690.0493.6498.2199.43100.0398.4898.46104.03109.31122.24126.78123.27121.82122.14125.27127.44126.25130.18136.90137.64137.22144.87152.59164.13164.08171.46168.57156.97160.93152.77151.19152.18153.42154.42155.68154.45

Tables

See key statistical data in the tables.
23.05.2023

Cost index of civil engineering works 2015=100 indices by structure

Cost index of civil engineering works (2015=100) point figureCost index of civil engineering works (2015=100) annual change, %Cost index of civil engineering works (2015=100) monthly change, %
11-17 Total index129.343.7-0.4
11 Foundation structures131.475.7-0.3
12 Earth structures124.877.3-0.1
13 Rock structures124.659.5-0.2
14 Surfacing154.45-5.9-0.8
15 Municipal engineering systems127.543.3-0.6
16 Concrete structures120.730.9-0.5
17 Technical and other systems120.185.2-0.1
20-22 Maintenance total117.494.1-1.0
20 Road maintenance117.975.0-0.7
21 Street maintenance117.863.4-1.2
22 Railway maintenance115.794.0-0.9
Crushing work132.486.2-1.1
The total index of the cost index of civil engineering works does not include the following separate indices: 20-22 Maintenance total, 20 Road maintenance, 21 Street maintenance, 22 Railway maintenance, Crushing work.
23.05.2023

Cost index of civil engineering works 2015=100, totalindex by cost factor

Statistical experts

Inquiries primarily
Aaro Laakkonen
Senior Statistician
029 551 3868

Referencing instructions

Referencing instructions

The statistical data released before 5.4.2022 can be found on the archive pages of the statistics.

Go to the archive page