Costs of civil engineering rose in February 2023 by 8.8 per cent from one year ago

release | Cost index of civil engineering works 2023, February

According to Statistics Finland, the costs of civil engineering rose by 8.8 per cent from February 2022 to February 2023. The annual change in costs varied by sub-index from 12.3 per cent for rock structures to 3.2 per cent for concrete structures.

Key selections

  • The costs of civil engineering rose by 8.8 per cent from one year back.
  • The annual change in costs varied by sub-index from 12.3 per cent for rock structures to 3.2 per cent for concrete structures.
  • Examined by cost factor, the biggest cost increases occurred in the costs of own machinery (22.4%) and purchased transport services (13.6%).
  • The total index went up by 0.2 per cent from the month before.

Tables

See key statistical data in the tables.

Cost index of civil engineering works 2015=100 indices by structure, February 2023

Cost index of civil engineering works 2020=100, totalindex by cost factor, February 2023

Database tables

Pick the data you need into tables, view the data as graphs, or download the data for your use.

Updated database tables
Classifications used:
  • Index base year
Period:
month
Updated:

Future releases

Background information

Documentation
Referencing instructions

Statistical experts

Inquiries primarily
Service email
info@stat.fi
Other experts
Head of Department in charge